• CEMENTING THE 20 INCHES SURFACE CASING 

      Tembo, Carlos Buinga (Master thesis, 2014)
      The placement of cement in annulus behind the casing is a important operation in an oil well s life. To ensure zonal isolation, the fluid in place in the annulus has to be completely displaced by the slurry. Poor excess ...